ADU / Guest House · Castle Pines Village, Douglas County, Colorado

ADU / Guest House Build Contractor in Castle Pines Village

Brothers 59 Construction delivers accessory dwelling unit in Castle Pines Village — gated ponderosa pine community above I-25. Typical project range $2M–$10M; gated estate residences on golf and ridge lots. 5.0/5 rating across 19 verified Google reviews.

Phone: 303-434-7658 · Email: michaelglivar1@gmail.com

Cost Guide

ADU / Guest House Build Cost in Castle Pines Village, Douglas County (2026)

TierInvestment RangeWhat's Included
Refined$350,000–$600,000600–900 sq ft detached guest house with full kitchen, bath, and finishes matched to the main home
Signature$600,000–$1,100,0001,000–1,500 sq ft ADU with vaulted living space, high-end kitchen, garage bay, and independent utilities
Architectural$1,100,000–$2,000,000+1,500+ sq ft custom guest residence with premium millwork, luxury baths, smart systems, and site-integrated architecture

Where the investment goes: Labor & trades 42–55% · Materials & fixtures 30–42% · Design, permits & mgmt 12–20%.

What drives Castle Pines Village ADU / Guest House cost

ADUs carry a full house's systems on a small footprint, so per-square-foot costs run high—foundations, separate utility connections, and septic capacity (common on Douglas County acreage lots) are major cost centers. Zoning is the biggest variable: Douglas County limits ADU size and requires it to be subordinate to the primary residence, and well/septic permitting through Tri-County Health can add months. Matching the main home's luxury finish level and any required fire-sprinkler systems push the upper tiers.

Scope of Work

ADU / Guest House in Castle Pines Village

Detached and attached ADUs from permit-set through CO: foundations, framing, full MEP, kitchen, bath, and finish package.

Trade Depth & Schedule

Douglas County ADU permitting, utility separation, and code-compliant egress, fire-rating, and energy assemblies.

Specification & Brands

Marvin, Sub-Zero/Wolf compact, Miele, Bosch

Castle Pines Village Communities

Active across CPV Homes Association ARC review and surrounding Castle Pines Village neighborhoods, with HOA-compliant design review packages prepared to each ARC standard.

Market Authority

Douglas County Permit Activity

Brothers 59 Construction publishes monthly Douglas County permit reports sourced from official county records.

View the full monthly permit report →
Related Services in Castle Pines Village

Kitchen Remodel in Castle Pines Village → · Bathroom Remodel in Castle Pines Village → · Whole-Home Remodel in Castle Pines Village → · Custom Home Builder in Castle Pines Village → · General Contractor in Castle Pines Village → · Home Addition in Castle Pines Village → · Basement Finishing in Castle Pines Village → · Primary Suite Remodel in Castle Pines Village → · Outdoor Living in Castle Pines Village → · Wellness Suite in Castle Pines Village → · Smart Home Automation in Castle Pines Village → · Wine Cellar in Castle Pines Village → · Home Theater in Castle Pines Village → · Pool & Spa in Castle Pines Village → · Auto Gallery in Castle Pines Village →

ADU / Guest House in Nearby Douglas County Communities

ADU / Guest House in Castle Pines North → · ADU / Guest House in Parker → · ADU / Guest House in Highlands Ranch → · ADU / Guest House in Lone Tree →

FAQ

ADU / Guest House in Castle Pines Village — Frequently Asked

Are ADUs allowed in Douglas County?

Yes, but with restrictions—size is typically capped relative to the main home, only one ADU per lot is permitted in most zones, and rural lots must verify well and septic capacity before approval; we handle the full zoning and permitting review up front.

Do I need a separate septic system for a guest house?

Often yes on unincorporated acreage; either your existing system must be re-engineered for the added load or a new field installed, which can add $30,000–$75,000 and requires Tri-County Health approval.

Can an ADU be rented out?

Long-term rental of a permitted ADU is generally allowed, but short-term rental rules vary by community and HOA—we recommend confirming current Douglas County and covenant restrictions during planning.

Contact

Start Your Castle Pines Village ADU / Guest House Build Project

Phone: 303-434-7658 · Email: michaelglivar1@gmail.com